Following the adjudication of our detailed cost/quality tender submission DSM are delighted to have been selected as the contractor for the demolition of extensive sections of the north and south sites at Leeds General Infirmary for Leeds Teaching Hospitals NHS Trust in preparation for the building of new adult and children’s hospitals.
This tender was published through the recently launched Crown Commercial Services Framework and gave DSM Demolition Ltd, an SME based in Birmingham, the opportunity to bid this prestigious project in competition with other pre-selected framework contractors
Leeds Teaching Hospitals NHS Trust, one of the largest teaching hospitals in the country, is demolishing and decommissioning targeted redundant buildings to create new centralised” state of the art” adult and children’s services joined hospital buildings. This complex demolition is due to start in September 2020 and will be completed by summer 2021. The new hospitals are expected to be built by 2025.”
Pictured Left: Billy Young, DSM Technical Director
Pictured Right: Simon Worthington, Leeds Teaching Hospital